I have all material on site. I had a contractor lined up and they cancelled the day before scheduled. Locate is done. Just need labor to do the patio leveling, retaining wall, and 700sqft patio installation.
For the concrete, I will be using 6 concrete precast stackable footings for the eventual pergola. They are ~54" tall and I would like installed under the patio so that the pavers on top of the footings are level with the patio. Each section requires a little mortar between each of the stackable sections as they are lowered on to each other. It is important that the footings be level to each other and then everything else levelled to them. It will allow me to install a pergola next spring when time/money permit. I did a simple drawing to illustrate what I mean (attached). My gas line is generally in the area between 2 of the footings.
I'll pay via Wells Fargo check after completion.