WANTED BATHROOM REMODELERS. TEAR OUT DONE AND TIME TO PUT BACK NEW.
BATH #1: MASTER: bathtub/shower removed, want oversize walk in shower installed. Shower pan, solid walls or large tile, double sink vanity (new plumbing done), flooring. See pictures attached.
BATH #2: WANT QUALITY 1-3 PIECE TUB/SHOWER ENCLOSURE. Have new vanity/sink/toilet ready to install. Flooring.
See pictures